Access comprehensive trade data for Gansu Goldwind Wind Power Equipment Manufacturing Co Limited with ease. Explore trade shipments, top suppliers & buyers, and values without the hassle.
Eximpedia analyzes Gansu Goldwind Wind Power Equipment Manufacturing Co Limited export and import records, including data from 1 buyers and 1 suppliers. We provide an intelligence report of Gansu Goldwind Wind Power Equipment Manufacturing Co Limited that covers trade statistics, shipment values, quantities, exporters & importers and trade destinations
Gansu Goldwind Wind Power Equipment Manufacturing Co Limited import markets
Explore the Gansu Goldwind Wind Power Equipment Manufacturing Co Limited import market with monthly import values, major importers, HS Codes, key ports, top suppliers, and competitors
HS CODE | USD VALUE | SHIPMENTS | % |
---|---|---|---|
8502310000 | 179.31 | 357 | 68.92 |
ELECTRIC GENERATING SETS AND ROTARY CONVERTERS | |||
8424890009 | 3.81 | 21 | 4.05 |
MECHANICAL APPLIANCES (WHETHER OR NOT HANDOPERATED) FOR PROJECTING, DISPERSING OR SPRAYING LIQUIDS OR POWDERS; FIRE EXTINGUISHERS, WHETHER OR NOT CHARGED; SPRAY GUNS AND SIMILAR APPLIANCES; STEAM OR SAND BLASTING MACHINES AND SIMILAR JET PROJECTING MACHIN | |||
8525899900 | 1.11 | 23 | 4.44 |
TRANSMISSION APPARATUS FOR RADIO-BROADCASTING OR TELEVISION, WHETHER OR NOT INCORPORATING RECEPTION APPARATUS OR SOUND RECORDING OR REPRODUCING APPARATUS; TELEVISION CAMERAS, DIGITAL CAMERAS AND VIDEO CAMERA RECORDERS | |||
8428102002 | 1.07 | 19 | 3.67 |
OTHER LIFTING, HANDLING, LOADING OR UNLOADING MACHINERY (FOR EXAMPLE, LIFTS , ESCALATORS, CONVEYORS, TELEFERICS) | |||
3820000000 | 0.31 | 4 | 0.77 |
Anti-freezing preparations and prepared de-icing fluids[Rate Ref by SNo 42 in Sch IV of Ntfn 01/2017 IGST] |
COUNTRY | USD VALUE | SHIPMENTS | % |
---|---|---|---|
NULL | 151.13 | 406 | 78.38 |
34.90 | 107 | 20.66 | |
CHINA | 0.00 | 4 | 0.77 |
EUROPEAN UNION | 0.00 | 1 | 0.19 |
PORT NAME | USD VALUE | SHIPMENTS | % |
---|
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
IE LLC ACWA POWER WIND KARATAU | 54.43 | 222 |
ENEL COLOMBIA SAESP | 198.31 | 206 |
IE LLC ACWA POWER DZHANKELDY WIND | 324.63 | 2714 |
IE LLC ACWA POWER BASH WIND | 326.28 | 3081 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
UNIBLU ENGINEERING AND CONTRACTING CO LIMITED | 56.37 | 260 |
SEPCOIII ELECTRIC POWER CONSTRUCTION CO LIMITED | 123.16 | 455 |
NORDEX ENERGY SE AND CO KG | 186.36 | 9834 |
GANSU GOLDWIND WIND POWER EQUIPMENT MANUFACTURING CO LIMITED | 358.62 | 518 |
CHINA ENERGY INTERNATIONAL GROUP CO LIMITED | 648.81 | 2803 |
If you are looking to establish relationship with Gansu Goldwind Wind Power Equipment Manufacturing Co Limited Automation you can save time by getting access to the key decision makers and get a detailed report.
Discover the Gansu Goldwind Wind Power Equipment Manufacturing Co Limited with product description, import values, quantities, exporter name, country of origin and key destinations.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. |
---|---|---|---|---|---|---|
8502310000 | CONSTRUCTION PROJECT OF ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 018 DISASSEMBLED PART OF THE KIT CONSISTS OF: BLADE 1 PC.: WEIGHT: 21640 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) CODE OF TECHNOLOGICAL EQUIPMENT:002; 1 | UZBEKISTAN | 0 | |||
8502310000 | CONSTRUCTION PROJECT OF ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 040 DISASSEMBLED PART OF THE KIT CONSISTS OF: HUB 1 PC.: WEIGHT: 42400 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) CODE OF TECHNOLOGICAL EQUIPMENT:002; 1 | UZBEKISTAN | 0 | |||
8502310000 | CONSTRUCTION PROJECT OF ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 007 DISASSEMBLED PART OF THE KIT CONSISTS OF: BLADE 1 PC.: WEIGHT: 21774 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) PROCESS EQUIPMENT CODE:002; 1 | UZBEKISTAN | 0 | |||
8502310000 | CONSTRUCTION PROJECT OF ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 019 DISASSEMBLED PART OF THE KIT CONSISTS OF: HUB 1 PC., GANDOLA 1 PC.: WEIGHT: 83300 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:2ND PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF TECHNOLOGICAL EQUIPMENT | UZBEKISTAN | 0 | |||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 068 DISASSEMBLED PART OF THE KIT CONSISTS OF: BLADE 3 PCS.: WEIGHT: 64346 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:3RD PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002; 1 | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 104 DISASSEMBLED PART OF THE KIT CONSISTS OF: 1 PC GENERATOR,: WEIGHT: 98000 KG, 1 PC STAKE; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002; 1 | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 100 DISASSEMBLED PART OF THE KIT CONSISTS OF: 1 PIECE BLADE,: WEIGHT: 21705 KG, 1 PIECE STAKE; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002; 10) | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 100 DISASSEMBLED PART OF THE KIT CONSISTS OF: EXTERNAL CONVERTER COOLING SYSTEM, CONVERTER CABINET A, CONVERTER CABINET B: WEIGHT: 5206 KG, 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:4TH PLACE | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 106 DISASSEMBLED PART OF THE KIT CONSISTS OF: DEHUMIDIFIER,FASTENERS,UPS LIGHTING CABINET: WEIGHT: 2973 KG, 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:7TH PLACE; 3) CONTACT NO.:TGHU9168667, QUANTITY:1; 8) INVESTPRO CODE | NULL | UZBEKISTAN | 0 | ||
7308909809 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) SET OF TOWER DOOR ESCALATOR RACKS - FT-TWLG: WEIGHT: 48 KG; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 3) CONTACT NO.:TGHU9168667, QUANTITY:1; 8) INVESTMENT PROGRAM CODE:101; 11) SIGN OF PUBLIC PROCUREMENT:02 | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 100 DISASSEMBLED PART OF THE KIT CONSISTS OF: ASSEMBLY PARTS PART 1, ASSEMBLY PARTS PART 2, : WEIGHT: 183 KG, COUNT 1 PIECE; 2) TYPE AND QUANTITY OF PACKAGING:2ND PLACE; 3) CONTACT NO.:GESU6795824, NUMBER:1; 8) | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 100 DISASSEMBLED PART OF THE KIT CONSISTS OF: FASTENERS, ASSEMBLY PARTS PART 3, LIDAR, COOLING SYSTEM OF THE TOWER: WEIGHT: 1943 KG, COUNT 1 PIECE; 2) TYPE AND QUANTITY OF PACKAGING:6TH PLACE; 3) CONTACT NO.:WEDU800619 | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 106 DISASSEMBLED PART OF THE KIT CONSISTS OF: COOLING SYSTEM, ASSEMBLY PARTS PART 1, ASSEMBLY PARTS PART 2, : WEIGHT: 333 KG, 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:3RD PLACE; 3) CONTACT NO.:XINU809 | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA.069 DISASSEMBLED PART OF THE KIT CONSISTS OF: CABLE FDLHEH 1,8/3KV 1X400MM2 1224 METER: WEIGHT: 2064 KG, 1 PIECE; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA.069 DISASSEMBLED PART OF THE KIT CONSISTS OF: CABLE FDLHEH 1,8/3KV 1X400MM2 1224 METER: WEIGHT: 2064 KG, 1 PIECE; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL | NULL | UZBEKISTAN | 0 | ||
8502310000 | CONSTRUCTION PROJECT OF ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 012 DISASSEMBLED PART OF THE KIT CONSISTS OF: BLADE 2 PCS.: WEIGHT: 42906 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:2ND PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) CODE OF TECHNOLOGICAL EQUIPMENT:002; 1 | UZBEKISTAN | 0 | |||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 038 DISASSEMBLED PART OF THE KIT CONSISTS OF: GENERATOR 1 PC.: WEIGHT: 98000 KG, 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002 | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 064 DISASSEMBLED PART OF THE KIT CONSISTS OF: BLADE 2 PCS.: WEIGHT: 43031 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:2ND PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002; 10) YEAR | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 064 DISASSEMBLED PART OF THE KIT CONSISTS OF: BLADE 2 PCS.: WEIGHT: 43031 KG, STAKE 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:2ND PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002; 10) YEAR | NULL | UZBEKISTAN | 0 | ||
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 074 DISASSEMBLED PART OF THE KIT CONSISTS OF: 3 PCS BLADE,: WEIGHT: 65202 KG, 1 PC STAKE; 2) TYPE AND QUANTITY OF PACKAGING:3RD PLACE; 8) INVESTMENT PROGRAM CODE:101; 9) THE CODE OF THE TECHNOLOGICAL EQUIPMENT:002; 10) | NULL | UZBEKISTAN | 0 |
No Pay, No Delay - 5 days Your Way!
Learn How our platform works in just 20 minutes!
Free Import-Export Sample data-One Click Away!
Gansu Goldwind Wind Power Equipment Manufacturing Co Limited export markets
Explore the UZBEKISTAN export market with monthly export values, major importers, HS Codes, key ports, top suppliers, and competitors
HS CODE | USD VALUE | SHIPMENTS | % |
---|---|---|---|
8502310000 | 0.74 | 1 | 100.00 |
ELECTRIC GENERATING SETS AND ROTARY CONVERTERS |
COUNTRY | USD VALUE | SHIPMENTS | % |
---|---|---|---|
CHINA | 0.74 | 1 | 100.00 |
PORTS | USD VALUE | SHIPMENTS | % |
---|---|---|---|
CUSTOMS POST OF THE FOREIGN ECONOMIC ACTIVITY ZARAFSHON | 0.74 | 1 | 100.00 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
SP LLC AZIA METALL PROF | 0.52 | 3807 |
LLC DURABLE STONE CORP | 0.52 | 494 |
LLP GLOBALINК TRANSPORTEYSHN END LODZHISTIКS VORLDVAYD | 1.19 | 132 |
IE LLC SHAMOL ZARAFSHAN ENERGY | 1.48 | 1 |
LLC DAILY MAIL CH Z JSC UZBEKISTON POCHTASI | 2.71 | 376483 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
CHDMM TA MINOTI SARBAND | 0.52 | 410 |
IE ASIA SUPPLY GROUP | 0.52 | 412 |
ACWA POWER AZERBAIJAN RENEWABLE ENERGY LIMITED LIABILITY COMPANY | 1.19 | 79 |
GANSU GOLDWIND WIND POWER EQUIPMENT MANUFACTURING CO LIMITED | 1.48 | 2 |
LLC AGREGATOR S ONLAYN | 2.23 | 275604 |
If you are looking to establish relationship with Gansu Goldwind Wind Power Equipment Manufacturing Co Limited Automation you can save time by getting access to the key decision makers and get a detailed report.
Discover the Gansu Goldwind Wind Power Equipment Manufacturing Co Limited with product description, import values, quantities, exporter name, country of origin and key destinations.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. |
---|---|---|---|---|---|---|
8502310000 | THE CONSTRUCTION PROJECT OF THE ZARAFSHAN WIND FARM WITH A CAPACITY OF 500 MW 1) GOLDWIND GW155 WIND POWER GENERATOR SET-4.7(4.5/4.6/4.7/4.8) 1 THE KIT IS NEW, MANUFACTURED IN 2023, MANUFACTURER: ?GOLDWIND INTERNATIONAL HOLDINGS (HK) LIMITED UZBEKISTAN ZARAFSHAN PROJECT? CHINA. 044 DISASSEMBLED PART OF THE KIT CONSISTS OF: GENERATOR 1 PC.: WEIGHT: 98000 KG, 1 PC.; 2) TYPE AND QUANTITY OF PACKAGING:1ST PLACE | UZBEKISTAN | CHINA | 0 |
Our dedicated team of experts delivers current and flexible data from key global locations, enabling you to make essential decisions with vital information and insights.
We use bespoke layered visualizations for diving deep into our country and logistics data to provide your team with graphical assistance and essential data analysis and reporting.
All of our datasets are quality-controlled by layers of inspection before it ever reach your platform. This helps us maintain the high reliability our clients have come to trust.
Keep an eye out for any collaboration between your suppliers and your rivals, as this may impact their ability to satisfy your requirements.
With instant remote on-screen assistance, chat support, and user training, our customer success team is available to you around the clock.
Explore competitors' shipment histories, statistical and analytical reports, and country-specific information from more than 130 nations.
See all that you can accomplish with Eximpedia