Access comprehensive trade data for China Energy International Group Co Limited with ease. Explore trade shipments, top suppliers & buyers, and values without the hassle.
Eximpedia analyzes China Energy International Group Co Limited export and import records, including data from 1 buyers and 1 suppliers. We provide an intelligence report of China Energy International Group Co Limited that covers trade statistics, shipment values, quantities, exporters & importers and trade destinations
China Energy International Group Co Limited import markets
Explore the China Energy International Group Co Limited import market with monthly import values, major importers, HS Codes, key ports, top suppliers, and competitors
HS CODE | USD VALUE | SHIPMENTS | % |
---|---|---|---|
8502310000 | 324.41 | 1233 | 43.99 |
ELECTRIC GENERATING SETS AND ROTARY CONVERTERS | |||
8541430000 | 56.79 | 261 | 9.31 |
DIODES, TRANSISTORS AND SIMILAR SEMI-CONDUCTOR DEVICES; PHOTOSENSITIVE SEMI-CONDUCTOR DEVICES; INCLUDING PHOTO VOLTAIC CELLS, WHETHER OR NOT ASSEMBLED IN MODULES OR MADE UP INTO PANELS; LIGHT-EMITTING DIODES (LE D); MOUNTED PIEZO- ELECTRIC CRYSTALS | |||
8504229000 | 36.80 | 168 | 5.99 |
Active Energy Controller (AEC) for use in manufacture of Renewable Power System (RPS) inverters (Read with Condition No. 24 below)[Exemption Duty Ref by SNo(497) in Ntfn 50-Customs/2017 dated 30.06.2017] Condition No. 24: If the importer at the time of | |||
8479899707 | 9.77 | 140 | 4.99 |
MACHINES AND MECHANICAL APPLIANCES HAVING INDIVIDUAL FUNCTIONS, NOT SPECIFIED OR INCLUDED ELSEWHERE IN THIS CHAPTER | |||
7214200000 | 7.87 | 1 | 0.04 |
OTHER BARS AND RODS OF IRON OR NON-ALLOY STEEL, NOT FURTHER WORKED THAN FORGED, HOT-ROLLED, HOT-DRAWN OR HOT-EXTRUDED, BUT INCLUDING THOSE TWISTED AFTER ROLLING |
COUNTRY | USD VALUE | SHIPMENTS | % |
---|---|---|---|
NULL | 302.92 | 1945 | 69.39 |
151.07 | 820 | 29.25 | |
RUSSIAN FEDERATION | 3.39 | 2 | 0.07 |
CHINA | 0.10 | 18 | 0.64 |
UZBEKISTAN | 0.10 | 1 | 0.04 |
PORT NAME | USD VALUE | SHIPMENTS | % |
---|
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
IE LLC ACWA POWER WIND KARATAU | 54.43 | 222 |
ENEL COLOMBIA SAESP | 198.31 | 206 |
IE LLC ACWA POWER DZHANKELDY WIND | 324.63 | 2714 |
IE LLC ACWA POWER BASH WIND | 326.28 | 3081 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
UNIBLU ENGINEERING AND CONTRACTING CO LIMITED | 56.37 | 260 |
SEPCOIII ELECTRIC POWER CONSTRUCTION CO LIMITED | 123.16 | 455 |
NORDEX ENERGY SE AND CO KG | 186.36 | 9834 |
GANSU GOLDWIND WIND POWER EQUIPMENT MANUFACTURING CO LIMITED | 358.62 | 518 |
CHINA ENERGY INTERNATIONAL GROUP CO LIMITED | 648.81 | 2803 |
If you are looking to establish relationship with China Energy International Group Co Limited Automation you can save time by getting access to the key decision makers and get a detailed report.
Discover the China Energy International Group Co Limited with product description, import values, quantities, exporter name, country of origin and key destinations.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. |
---|---|---|---|---|---|---|
8541430000 | 1. SOLAR PANELS 570W--3600SHTUK. MANUFACTURER: JA SOLAR INTERNATIONAL LIMITED. DESIGN, SUPPLY AND CONSTRUCTION WITHIN THE FRAMEWORK OF THE PROJECT OF A SOLAR PHOTOVOLTAIC PLANT WITH A CAPACITY OF 200 MW IN THE TASHKENT REGION:., - 3600 PCS., WEIGHT: 114480 KG 2. 100 SEATS, 100 SEATS 3. PKEU2115035,OOLU8295271,PKEU2113536,PKEU2100668,PKEU2101026 8. 103 9. 002 10. 2023/2023/565 TUE 11. 02 TOTAL NUMBER OF SEATS: 100 | UZBEKISTAN | 0 | |||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 3 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF BUKHARA REGION - WEIGHT: 1289.6 KG 2. SEATS 3, 3 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 3 | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 018, MODEL: EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (9.35% OF 1 SET, BLADE BLADE B2-1 PIECE) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A WIND FARM WITH A CAPACITY OF 500 MW IN THE PESHKUN DISTRICT OF BUKHARA REGION - 1 PIECE, WEIGHT: 20540 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 02 | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 018, MODEL: EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (9.35% OF 1 SET, BLADE BLADE V3-1 PIECE) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A WIND FARM WITH A CAPACITY OF 500 MW IN THE PESHKUN DISTRICT OF BUKHARA REGION - 1 PIECE, WEIGHT: 20540 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 02 | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 026, MODEL: EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (9.35% OF 1 SET, BLADE BLADE B2-1 PIECE) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A WIND FARM WITH A CAPACITY OF 500 MW IN THE PESHKUN DISTRICT OF BUKHARA REGION - 1 PIECE, WEIGHT: 20540 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 02 | UZBEKISTAN | 0 | |||
8479899707 | 1) SOLAR TRACKING SYSTEM EQUIPMENT, TRACKING TYPE: INDEPENDENT HORIZONTAL UNIAXIAL TRACKER; TRACKING RANGE: +60?; DRIVE TYPE: SYNCHRONOUS MULTI-TURN DRIVE WITH MANUAL TRANSMISSION, SYSTEM VOLTAGE: 1000 V OR 1500 V (DISASSEMBLED, PARTIAL DELIVERY 0.23% OF 4450 SETS) DESIGN, SUPPLY AND CONSTRUCTION WITHIN THE FRAMEWORK OF THE PROJECT OF A SOLAR PHOTOVOLTAIC PLANT WITH A CAPACITY OF 200 MW IN THE TASHKENT REGION: WEIGHT: 24288 KG, COUNT 4450 PCS; 2) VI | UZBEKISTAN | 0 | |||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 3 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF BUKHARA REGION - WEIGHT: 1289.6 KG 2. SEATS 3, 3 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 3 | UZBEKISTAN | 0 | |||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 3 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF BUKHARA REGION - WEIGHT: 1289.6 KG 2. SEATS 3, 3 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 3 | UZBEKISTAN | 0 | |||
8541430000 | 1) SOLAR PANELS 570W - 3600SHTUK. MANUFACTURER: JA SOLAR INTERNATIONAL LIMITED. DESIGN, SUPPLY AND CONSTRUCTION WITHIN THE FRAMEWORK OF THE PROJECT OF A SOLAR PHOTOVOLTAIC PLANT WITH A CAPACITY OF 200 MW IN THE TASHKENT REGION:: WEIGHT: 114480 KG, COUNT 3600 PCS; 2) TYPE AND QUANTITY OF PACKAGING:100 PALLET; 3) CONTACT NO.:PKEU2109937; LYGU0076734; MCCU3006543; PKEU2108972; PKEU2105295, QTY:5; ; 8) INVESTMENT PROGRAM CODE:103; 9) CODE OF TECHNOLOGICAL EQUIPMENT:002; 10) YEAR OF MANUFACTURE AND TECHNICAL | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 063 MODEL:EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (0.9% OF 1 SET, ACCORDING TO THE DETAILS: BOLTS, NUTS, ETC.) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - NUMBER OF 1 PIECE, WEIGHT: 2551 KG 2. PLACES 7, 7 TREES.THE BOX. 8. 103 9. 002 10. 2023/ MANUFACTURER: ENVISION ENERGY. EN-171 | NULL | UZBEKISTAN | 0 | ||
8502310000 | 1. WIND TURBINE GENERATOR SET 054, MODEL: EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (3.32% OF 1 SET, BOLTS, NUTS, GASKETS, ETC.) IS SUPPLIED FOR ITS OWN NEEDS AS PART OF THE IMPLEMENTATION OF AN INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - NUMBER OF 1 PIECE, WEIGHT: 8252 KG 2. PLACES 18, 18 PLACES 8. 103 9. 002 10. 2023/ MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 0 | NULL | UZBEKISTAN | 0 | ||
8502310000 | 1. WIND TURBINE GENERATOR SET 053, MODEL:EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (4.6% OF 1 SET, S4 TOWER SECTION-1 PIECE) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - NUMBER OF 1 PIECE, WEIGHT: 43097 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/ MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 02 | NULL | UZBEKISTAN | 0 | ||
8502310000 | 1. WIND TURBINE GENERATOR SET 053, MODEL:EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (4.6% OF 1 SET, S2 TOWER SECTION-1 PIECE) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - NUMBER OF 1 PIECE, WEIGHT: 69736 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/ MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 02 | NULL | UZBEKISTAN | 0 | ||
8502310000 | 1. WIND TURBINE GENERATOR SET 011, DELIVERED DISASSEMBLED, PARTIAL DELIVERY - (6.30% OF 1 SET - HUB), AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A WIND FARM WITH A CAPACITY OF 500 MW IN THE PESHKUN DISTRICT OF BUKHARA REGION - 1 PIECE, WEIGHT: 39700 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/EN-171/6.5 50HZ 11. 02 1. WIND TURBINE GENERATOR SET 014, DELIVERED DISASSEMBLED, PARTIAL DELIVERY - (0.04% OF 1 SET - IN | UZBEKISTAN | 0 | |||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 3 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 1289.6 KG 2. SEATS 3, 3 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 3 | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 016 MODEL:EN-171/6.5 50 HZ, NEW, 2023 ISSUE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (9.35% OF 1 SET, BLADE BLADE B1-1 PIECE) SUPPLIED FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A WIND POWER PLANT WITH A CAPACITY OF 500 MW IN GIJDUVAN DISTRICT OF BUKHARA REGION - 1 PIECE, WEIGHT: 20540 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/MANUFACTURER: ENVISION ENERGY. EN-171/6.5 50 HZ 11. 02 | UZBEKISTAN | 0 | |||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF BUKHARA REGION - WEIGHT: 2179 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | 0 | |||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 3 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF BUKHARA REGION - WEIGHT: 1289.6 KG 2. SEATS 3, 3 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 3 | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 016, DELIVERED DISASSEMBLED, PARTIAL DELIVERY - 9.35% OF 1 SET -BLADE BLADE B2), AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A WIND FARM WITH A CAPACITY OF 500 MW IN GIJDUVAN DISTRICT OF BUKHARA REGION - 1 PIECE, WEIGHT: 20540 KG 2. SEATS 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/EN-171/6.5 50HZ 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | 0 | |||
8502310000 | 1. WIND TURBINE GENERATOR SET 047, MODEL EN-171/6.5 50 HZ, NEW, 2023 YEAR OF MANUFACTURE, DELIVERED DISASSEMBLED, PARTIAL DELIVERY (38.42% OF ONE SET - GONDOLA CABIN) FOR OWN NEEDS AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION. MANUFACTURER: ENVISION ENERGY CO.,LTD. (CHINA) - 1 PIECE STAKE, WEIGHT: 120500 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 9. 002 10. 2023/EN-171/6.5 50 HZ | NULL | UZBEKISTAN | 0 |
No Pay, No Delay - 5 days Your Way!
Learn How our platform works in just 20 minutes!
Free Import-Export Sample data-One Click Away!
China Energy International Group Co Limited export markets
Explore the UZBEKISTAN export market with monthly export values, major importers, HS Codes, key ports, top suppliers, and competitors
HS CODE | USD VALUE | SHIPMENTS | % |
---|---|---|---|
7326909807 | 1.24 | 379 | 85.17 |
OTHER ARTICLES OF IRON OR STEEL | |||
8483908909 | 0.03 | 66 | 14.83 |
TRANSMISSION SHAFTS (INCLUDING CAM SHAFTS AND CRANK SHAFTS) AND CRANKS; BEARING HOUSINGS AND PLAIN SHAFT BEARINGS; GEARS AND GEARING; BALL OR ROLLER SCREWS; GEAR BOXES AND OTHER SPEED CHANGERS, INCLUDING TORQUE CONVERTERS; FLYWHEELS AND PULLEYS, INCLUDING |
COUNTRY | USD VALUE | SHIPMENTS | % |
---|---|---|---|
CHINA | 1.26 | 445 | 100.00 |
PORTS | USD VALUE | SHIPMENTS | % |
---|---|---|---|
CUSTOMS POST OF FOREIGN ECONOMIC ACTIVITY GIJDUVAN | 1.26 | 445 | 100.00 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
CJSC AEROMAR | 4.28 | 1630 |
LLC BELENERGOMASH BZEM | 4.49 | 157 |
JSC ATOMSTROYEXPORT | 13.25 | 1644 |
SKY CARGO SERVICE LLC TODAY LLC GURT | 17.27 | 49 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
BRANCH OF INSETCOM LLC IN TURKEY | 3.64 | 41 |
CHINA NUCLEAR ENERGY CORPORATION CNEIC | 5.57 | 272 |
CHINA NUCLEAR ENERGY INDUSTRY CORPORATION CNEIC | 11.81 | 276 |
CASA DA MOEDA DO BRASIL CMB | 16.50 | 42 |
If you are looking to establish relationship with China Energy International Group Co Limited Automation you can save time by getting access to the key decision makers and get a detailed report.
Discover the China Energy International Group Co Limited with product description, import values, quantities, exporter name, country of origin and key destinations.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. |
---|---|---|---|---|---|---|
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 1976 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
8483908909 | 1. GEAR WHEEL - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 13 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
8483908909 | 1. GEAR WHEEL - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 13 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 4081 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 4166 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 1985 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 4166 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
8483908909 | 1. GEAR WHEEL - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 13 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 1985 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 4132 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 4165 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 4133 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
8483908909 | 1. GEAR WHEEL - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 13 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 1975 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 2 PCS, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 4166 KG 2. SEATS 2, 2 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 2 | UZBEKISTAN | CHINA | 0 | ||
8483908909 | 1. GEAR WHEEL - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 13 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 1985 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN THE PESHKUN DISTRICT OF THE BUKHARA REGION - WEIGHT: 1985 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
8483908909 | 1. GEAR WHEEL - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 13 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 | ||
7326909807 | 1. METAL FASTENING SUPPORT FOR MOVING GOODS - 1 PIECE, SUPPLIED AS PART OF THE IMPLEMENTATION OF THE INVESTMENT PROJECT ?CONSTRUCTION OF A 500 MW WIND FARM IN GIJDUVAN DISTRICT OF BUKHARA REGION - WEIGHT: 1985 KG 2. PLACES 1, 1 WITHOUT PACKAGING 8. 103 11. 02 TOTAL NUMBER OF SEATS: 1 | UZBEKISTAN | CHINA | 0 |
Our dedicated team of experts delivers current and flexible data from key global locations, enabling you to make essential decisions with vital information and insights.
We use bespoke layered visualizations for diving deep into our country and logistics data to provide your team with graphical assistance and essential data analysis and reporting.
All of our datasets are quality-controlled by layers of inspection before it ever reach your platform. This helps us maintain the high reliability our clients have come to trust.
Keep an eye out for any collaboration between your suppliers and your rivals, as this may impact their ability to satisfy your requirements.
With instant remote on-screen assistance, chat support, and user training, our customer success team is available to you around the clock.
Explore competitors' shipment histories, statistical and analytical reports, and country-specific information from more than 130 nations.
See all that you can accomplish with Eximpedia