Access comprehensive trade data for Intecsa Ingeniera Industrial with ease. Explore trade shipments, top suppliers & buyers, and values without the hassle.
Eximpedia analyzes Intecsa Ingeniera Industrial export and import records, including data from 0 buyers and 1 suppliers. We provide an intelligence report of Intecsa Ingeniera Industrial that covers trade statistics, shipment values, quantities, exporters & importers and trade destinations
Intecsa Ingeniera Industrial import markets
Explore the Intecsa Ingeniera Industrial import market with monthly import values, major importers, HS Codes, key ports, top suppliers, and competitors
HS CODE | USD VALUE | SHIPMENTS | % |
---|---|---|---|
8402900000 | 4.36 | 36 | 30.25 |
STEAM OR OTHER VAPOUR GENERATING BOILERS (OTHER THAN CENTRAL HEATING HOT WATER BOILERS CAPABLE ALSO OF PRODUCING LOW PRESSURE STEAM); SUPERHEATED WATER BOILERS | |||
7308909809 | 3.04 | 33 | 27.73 |
STRUCTURES (EXCLUDING PREFABRICATED BUILDINGS OF HEADING 9406) AND PARTS OF STRUCTURES (FOR EXAMPLE, BRIDGES AND BRIDGE-SECTIONS, LOCK-GATES, TOWERS, LATTICE MASTS, ROOFS, ROOFING FRAME-WORKS, DOORS AND WINDOWS AND THEIR FRAMES AND THRESHOLDS FOR DOORS, S | |||
8419908509 | 2.97 | 21 | 17.65 |
MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER OR NOT ELECTRICALLY HEATED (EXCLUDING FURNACES, OVENS AND OTHER EQUIPMENT OF HEADING 8514), FOR THE TREATMENT OF MATERIALS BY A PROCESS INVOLVING A CHANGE OF TEMPERATURE SUCH AS HEATING, COOKING, ROASTING, | |||
8411828000 | 1.96 | 8 | 6.72 |
TURBO-JETS, TURBO-PROPELLERS AND OTHER GAS TURBINES | |||
8307100000 | 0.85 | 4 | 3.36 |
FLEXIBLE TUBING OF BASE METAL, WITH OR WITHOUT FITTINGS |
COUNTRY | USD VALUE | SHIPMENTS | % |
---|---|---|---|
NULL | 14.77 | 119 | 100.00 |
PORT NAME | USD VALUE | SHIPMENTS | % |
---|
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
JSC TOSHKENT ISSIQLIK ELEKTR MARKAZI | 2.30 | 74 |
ABBASOVA OL GA GAYRADOVNA | 2.70 | 814 |
SAIPEM CONTRACTING NIG LIMITED | 3.65 | 3127 |
LLC ELIT GRAND | 6.17 | 120 |
JSC TALIMARDZHANSКAYA TES | 52.79 | 3044 |
COMPANY | USD VALUE | SHIPMENTS |
---|---|---|
JIANGSU HUANAN NEW ENERGY TECHNOLOGY CO LIMITED | 3.03 | 26 |
SCD JV SCARL | 3.64 | 1000 |
GUCSAN MAKINA DOGALGAZ SAN VE TIC LIMITED STI | 6.17 | 91 |
INTECSA INGENIERA INDUSTRIAL | 8.73 | 119 |
INTECSA INGENIERA INDUSTRIAL S A | 41.03 | 479 |
If you are looking to establish relationship with Intecsa Ingeniera Industrial Automation you can save time by getting access to the key decision makers and get a detailed report.
Discover the Intecsa Ingeniera Industrial with product description, import values, quantities, exporter name, country of origin and key destinations.
HSN Code | Product Description | Imports | Exporter | Origin | Destination | Qty. |
---|---|---|---|---|---|---|
8419908509 | 1. TURBINE COOLING AIR COOLER WITH FUEL GAS HEATER / TURBINE AIR COOLER WITH FUEL GAS HEATER - 1 SET. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 22175 KG 2. PLACES 1, 1 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 1 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - MAIN STRUCTURE - CASING & DUCT COLUMNS AND BEAMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN STRUCTURE - BEAMS AND COLUMNS FOR FLUE AND HOUSING - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 38642.7 KG 2. PLACES 3, 3 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 3 | NULL | UZBEKISTAN | 0 | ||
7308909809 | 1. STEAM PIPING FOR ST / STEAM PIPE FOR PT - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT ""EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW"" (PP-169C DATED 05/31/2023) - WEIGHT: 14969.45 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - MAIN STRUCTURE - CASING & DUCT COLUMNS AND BEAMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN STRUCTURE - BEAMS AND COLUMNS FOR FLUE AND HOUSING - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 37,831.9 KG 2. PLACES 3, 3 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 3 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - MAIN STRUCTURE - CASING & DUCT COLUMNS AND BEAMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN STRUCTURE - BEAMS AND COLUMNS FOR FLUE AND HOUSING - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 35070.6 KG 2. PLACES 8, 8 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 8 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - MAIN STRUCTURE - CASING & DUCT COLUMNS AND BEAMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN STRUCTURE - BEAMS AND COLUMNS FOR FLUE AND HOUSING - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 37,831.9 KG 2. PLACES 3, 3 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 3 | NULL | UZBEKISTAN | 0 | ||
8411828000 | 1. GT CAS TURBINE PARTS / GAS TURBINE COMPONENTS - 1 SET (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - 1 PC., WEIGHT: 9251 KG 2. PLACES 14, 14 SPECIAL PACKAGING 8. 102 9. 002 10. 2023/GT CAS TURBINE PARTS 11. 02 TOTAL NUMBER OF SEATS: 14 | NULL | UZBEKISTAN | 0 | ||
7308909809 | 1. BASE PLATE & PEDESTRIAN & OTHERS / BASE PLATE, BASE, ETC. - 1 COMP. THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 22630 KG 2. PLACES 7, 7 SPECIAL PACKAGING 8. 102 11. 02 TOTAL NUMBER OF SEATS: 7 | NULL | UZBEKISTAN | 0 | ||
8411828000 | 1. GT CAS TURBINE PARTS / GAS TURBINE COMPONENTS - 1 SET (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - 1 PIECE, WEIGHT: 18,000 KG 2. 20 PLACES, 20 SPECIAL PACKAGING 8. 102 9. 002 10. 2023/GT CAS TURBINE PARTS 11. 02 TOTAL NUMBER OF SEATS: 20 | NULL | UZBEKISTAN | 0 | ||
8411828000 | 1. GT CAS TURBINE PARTS / GAS TURBINE COMPONENTS - 1 SET (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - 1 PC., WEIGHT: 15590 KG 2. PLACES 14, 14 SPECIAL PACKAGING 8. 102 9. 002 10. 2023/GT CAS TURBINE PARTS 11. 02 TOTAL NUMBER OF SEATS: 14 | NULL | UZBEKISTAN | 0 | ||
8411828000 | 1. GT GENERATOR PARTS / COMPONENTS OF THE GT - 1 GENERATOR SET. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - 1 PC., WEIGHT: 3162 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 9. 002 10. 2023/GT GENERATOR PARTS 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 | ||
8411828000 | 1. GT CAS TURBINE PARTS / GAS TURBINE COMPONENTS - 1 SET (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - 1 PC., WEIGHT: 24520 KG 2. PLACES 17, 17 SPECIAL PACKAGING 8. 102 9. 002 10. 2023/GT CAS TURBINE PARTS 11. 02 TOTAL NUMBER OF SEATS: 17 | NULL | UZBEKISTAN | 0 | ||
8307100000 | 1. ST CROSS OVER PIPING / BYPASS PIPELINE PT - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED-CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 16043 KG 2. PLACES 3, 3 SPECIAL PACKAGING 8. 102 11. 02 TOTAL NUMBER OF SEATS: 3 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - STACK - STACK SHELLS, BREECH DUCTS & PLATFORMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN CHIMNEY - CHIMNEY CASING, DUCT CLOSURES AND PLATFORMS - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 17095.5 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - STACK - STACK SHELLS, BREECH DUCTS & PLATFORMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN CHIMNEY - CHIMNEY CASING, DUCT CLOSURES AND PLATFORMS - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 15581.7 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - STACK - STACK SHELLS, BREECH DUCTS & PLATFORMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN CHIMNEY - CHIMNEY CASING, DUCT CLOSURES AND PLATFORMS - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 14608.3 KG 2. PLACES 5, 5 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 5 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - STACK - STACK SHELLS, BREECH DUCTS & PLATFORMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN CHIMNEY - CHIMNEY CASING, DUCT CLOSURES AND PLATFORMS - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 14166 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - STACK - STACK SHELLS, BREECH DUCTS & PLATFORMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN CHIMNEY - CHIMNEY CASING, DUCT CLOSURES AND PLATFORMS - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 14158.2 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 | ||
7304399809 | 1. GT EXHAUST DUCT / GAS FLUE GT - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 8085 KG 2. PLACES 2, 2 SPECIAL PACKAGING 8. 102 11. 02 TOTAL NUMBER OF SEATS: 2 | NULL | UZBEKISTAN | 0 | ||
8402900000 | 1. HRSG 1 & 2 - STACK - STACK SHELLS, BREECH DUCTS & PLATFORMS / HEAT RECOVERY BOILER 1 AND 2 - MAIN CHIMNEY - CHIMNEY CASING, DUCT CLOSURES AND PLATFORMS - 1 COMP. (PART) THESE GOODS ARE SUPPLIED WITHIN THE FRAMEWORK OF THE PROJECT EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS PLANTS WITH A TOTAL CAPACITY OF AT LEAST 900 MW (PP-169C DATED 05/31/2023) - WEIGHT: 15641.2 KG 2. PLACES 4, 4 SPECIAL PACKAGING 8. 102 9. 000 11. 02 TOTAL NUMBER OF SEATS: 4 | NULL | UZBEKISTAN | 0 |
No Pay, No Delay - 5 days Your Way!
Learn How our platform works in just 20 minutes!
Free Import-Export Sample data-One Click Away!
Our dedicated team of experts delivers current and flexible data from key global locations, enabling you to make essential decisions with vital information and insights.
We use bespoke layered visualizations for diving deep into our country and logistics data to provide your team with graphical assistance and essential data analysis and reporting.
All of our datasets are quality-controlled by layers of inspection before it ever reach your platform. This helps us maintain the high reliability our clients have come to trust.
Keep an eye out for any collaboration between your suppliers and your rivals, as this may impact their ability to satisfy your requirements.
With instant remote on-screen assistance, chat support, and user training, our customer success team is available to you around the clock.
Explore competitors' shipment histories, statistical and analytical reports, and country-specific information from more than 130 nations.
See all that you can accomplish with Eximpedia